That's running stable
Bulk handling Uniper
Uniper Transportinstallation
Geldof Engicon (BE) has awarded TES Industrial Systems the contract to deliver the control for a wood pellet transport installation for the MPP3 power plant at Uniper on the Maasvlakte.
The drives are controlled by, among others, ABB ACS800 frequency converters and Siemens Simocode. The control is programmed in a Siemens S7-400 PLC and communicates with an ABB Melody SCADA system.
The engineering, panel construction, assembly and commissioning were carried out entirely by TES.
Some information:
• Drives from 0.75 kW to 315 kW
• 15.000 man-hours
• 25km of cabling